The project includes 4”, 6”, and 8” graded aggregate base, 2” 9.5mm and 19mm asphalt paving, standard and heavy duty concrete, striping, storm drainage and appurtenances, traffic signage, concrete bollards and wheel stops, chain link fencing, site grading, erosion control, and demolition.



