TECHNICAL SPECIFICATION
Any job designed by M.E. Sack Engineering shall be constructed in accordance with M.E. Sack Engineering minimum specifications. In municipalities with their own specifications, their specifications shall supersede those available at the link below. Likewise, projects that are bid shall be held to the specifications within the bid document which may differ from the minimum specification requirements at the link below. It is the responsibility of the contractor to ensure they have the appropriate specifications for each project.
