The project consists of concrete pavement removal, drainage structure removal, shoulder scraping, 8” granular roadway base, asphalt milling, 2” mill and overlay, 1.5” 9.5mm asphalt paving, ¾” to 1” crack relief interlayer, striping, drainage adjustment/replacement, shoulder backing, grassing, and traffic control.